Midwest Bender Services

Leading the Industry in Tube Bender Rebuilds, Service & Parts

Bender Rebuilds

Midwest Bender Services offers a complete maintenance and rebuild service to CNC tube bending manufacturers. A rebuild consists of stripping the bender and repairing or replacing all mechanical, hydraulic and electrical devices.

Mechanical:

  • Completely strip machine, wire brush and paint with primer and enamel.
  • Rebuild swing arm shaft, install new tool plate on die boss.
  • Install new swing arm bearings, check and adjust preload on bearings.
  • Install new drive chain and mounting links, replace worn idlers and bearings.
  • Install new wear strips on swing away clamp, re-grind or replace clamp slide.
  • Install new pins and bushings on swing arm.
  • Install new wear strips on pressure die holder.
  • Install new follower bar and master bar.
  • Install new wear strips on pressure die slide way, clean and lube then re-assemble and adjust.
  • Install new slide way and bearings on carriage.
  • Install new bearing on B axis spindle.
  • Rebuild master collet assembly and install new thrust bearing on collet closer.
  • Install new machine pump, replace all lines, hoses, fittings and meter units.
  • Rebuild wiper die mounting.
  • Rebuild mandrel base and adjustment nut.
  • Install new tube support, air cylinder and valve.

Electrical:

  • Remove all existing electrical components and wiring.
  • Install all new machine wiring.
  • Install new Y and B axis drive system with geared drive servo motors.
  • Install rack and pinion drive for Y axis. Install gear head drive on B axis.
  • Install new cable carrier and all wiring to Y and B axis.
  • Install new encoder for C axis (swing arm).
  • Install new control system with touch screen operator interface.
  • Install all new electrical enclosures.
  • Install all new conduits, S.O. cords and related hardware.
  • Install new main drive motor, coupling and spider.

Hydraulic:

  • Clean out and wire brush hydraulic reservoir, install new suction screens.
  • Remove all old hydraulic components, lines, fittings, pumps and valves.
  • Install new pressure compensated main pump.
  • Install new externally mounted hydraulic manifold.
  • Install new hydraulic electric solenoid valves.
  • Install new pressure control valves and gauges.
  • Install new proportional valve for bend axis.
  • Install new accumulator for pressure die.
  • Install new hydraulic hoses and fittings.

Contact us for additional inforamtion and pricing